PROJECTS
Woodside XENA Project
MARKET ENERGY
SECTOR LNG
Origin(s)
Kalundborg, Denmark
Destination
Woodside Burrup Material Facility, Australia

Project

Woodside XENA Project
Equipment
1 x Flexible Flowline Reel Ancillary Equipment
Total Volume
1,000 cbm
Total Weight
150 mt
Heaviest Lift
85 mt
Year
2014
PROJECT OVERVIEW

Westlink provided an end-to-end logistics solution – from factory to field – with vessel loading operations at the NOV’s private berth in Kalundborg, Denmark, and timely delivery of the reel and ancillary equipment to Woodside’s Burrup Material Facility (BMF) in Dampier, Australia.

SCOPE
  • Pre-shipment quarantine and factory completion inspection of reel and equipment in Kalundborg
  • Heavy Lift Vessel (HLV) – Kalundborg, Australia to Woodside BMF, Australia
HIGHLIGHTS
  • Zero Lost Time Injuries (LTI’s)
  • Third party Marine Warranty Surveyor compliance
  • Successful loading and discharge at NOV and Woodside private berths respectively
  • Australian Invasive Marine Species (IMS) compliance associated with private berth
  • Delivered twenty (20) days ahead of schedule
GALLERY