Woodside GWF-1 Project
MARKET ENERGY
SECTOR LNG
Origin(s)
Port Kelang, Malaysia Singapore
Destination
Port Kelang, Malaysia Singapore

Project

Woodside GWF-1 Project
Equipment
Piles and Subsea Installation Gear
Total Volume
3,000 cbm
Total Weight
580 mt
Heaviest Lift
110 mt
Year
2014
PROJECT OVERVIEW

Westlink was engaged by a customer for the transportation of subsea installation equipment and infrastructure from various locations in South East Asia to the Burrup Material Facility (BMF) in Dampier, Australia for subsea works on the Greater Western Flank Phase 1 (GWF-1) project.

SCOPE
  • Multipurpose Vessel (MPP) – transportation of piles from Port Kelang to Jurong Port, Singapore
  • Tug and barge – transportation of subsea installation gear from Technics yard in Singapore to Jurong Port
  • Vessel to vessel interface – tug and barge with MPP for transfer of subsea installation gear
  • MPP – transport of piles and subsea gear from Jurong Port to BMF, Dampier, Australia
  • MPP – BMF, Dampier to Singapore for return of all subsea equipment after installation complete
HIGHLIGHTS
  • Zero LTIs
  • Marine Warranty Surveyor approval and compliance
  • Specialist lifting, lashing and stowage design and planning
  • Vessel to vessel transfer – lift of subsea installation gear from barge to MPP
  • MPP selection to meet constraints of berthing at BMF including draft, LOA and others
  • Quarantine management and approval of used subsea equipment
  • On time delivery met tight construction window